Subnet Management - 5kdm2 (Application)

There’s an open proposal for changing subnet membership - Proposal: 131403 - ICP Dashboard (internetcomputer.org). This information is presented below:

  • red marker represents a removed node
  • green marker represents an added node
  • highlighted patches represent the country a node sits within

Table
Country Data Center Owner Node Provider Node
--- Germany Munich (mu1) q.beyond Staking Facilities tyofn-r6bgb-5a533-2vptk-hgl47-xz3se-ssxyd-ws4i4-o7c4x-5zczx-gqe
+++ Korea (the Republic of) Seoul 2 (kr2) Gasan Web3game pzv3b-av4if-exyju-qfmed-zbeez-2xlcd-sj22c-zdhus-gnwmo-7cbse-aqe
Canada Fremont (fm1) Hurricane Electric 1G bmlxd-vohad-ymfvi-hm7id-7g3vp-236w4-n3cqd-tkwgf-wlrww-lqbcr-gqe
Switzerland Geneva (ge1) HighDC Archery Blockchain SCSp tybza-gyple-63wq2-qsgwo-w6fqw-6trwu-awukb-skekh-67bqu-qsoeo-aae
Switzerland Zurich 4 (zh4) Nine.Ch Tomahawk.vc jtvnx-kem2o-icln6-b4oy6-n5ru5-dmksj-dfk5i-4ejvq-k3unp-47gjb-mae
India Colombo 1 (cm1) OrionStellar Geodd Pvt Ltd zppi4-egu2x-ylkfm-fttld-d5v43-wq7zs-hnszi-6plxh-6ol3h-ibceq-xae
India Panvel 2 (pl2) Yotta Krishna Enterprises srgrm-5pwg2-225hn-fxwdd-zphpu-wwxgu-uxako-avmlx-epw7e-zwkhf-sqe
Israel Tel Aviv 1 (tv1) Interhost GeoNodes LLC vwsvq-sp3z5-kjy66-srr2f-esws7-mzchn-oeqdb-n3qvz-wrzni-4pcsy-lae
Japan Tokyo 3 (ty3) Equinix Starbase oswv7-a355p-a5jlp-ko7pj-arrs2-rghho-dti4z-xgptn-szn55-jjr46-uqe
Romania Bucharest (bu1) M247 Iancu Aurel bjhao-hlctl-g24ce-7hfcg-mqxbw-yxhyq-q23mj-smxsk-4o2s4-u353p-zqe
Slovenia Ljubljana (lj1) Posita.si Fractal Labs AG wq5v7-ngito-7ztqs-zlf2v-ibk6f-e54em-t3hou-x24kz-v5j77-6vo72-kqe
Sweden Stockholm 1 (sh1) Digital Realty DFINITY Operations SA zos66-lmcn7-satbv-gcdzj-q3cdf-4n6zc-2hlei-gc453-uoh7r-4sj3w-vqe
United States of America (the) Dallas (dl1) Flexential 87m Neuron, LLC ugqji-f7rfx-mbubv-44r5n-zfi3k-7ag32-qhkal-xmmyu-5fbot-r6azo-aqe
South Africa Gauteng 2 (jb2) Africa Data Centres Honeycomb Capital (Pty) Ltd ocvcv-56eg5-gxibh-dcgpo-unhwq-4bwmo-x7q3h-stwf2-ycfex-gdr2a-kae

The removed node is replaced with a node based in South Korea. This looks positive for decentralisation. I’ve verified that this node is currently unassigned.

The proposal mentions that his change is needed due to the Munich (mu1) data centre being due for decommissioning. I have some questions about this which I’ve asked on another topic.