Proposal 137176 Review | Krzysztof Żelazko - ICP Hub Poland
This proposal removes the Node Operator: hh2jd-pll7v-ewzhe-xwzjs-akev6-saooq-zpj2v-ugark-3wo5p-wzo5j-4qe
.
The operator was initially linked to Node Provider Rivonia Holdings LLC, and it represents 14 nodes in the ny1 data center. As communicated on the forum, these nodes are being transferred to ParaFi Technologies LLC, and the removal of this Node Operator is a necessary step to finalize the transition.
This proposal is a resubmission of proposal 137077, which soft-failed due to nodes being automatically re-registered following an orchestrator restart prior to execution.
I voted to Adopt this proposal because:
- The nodes are no longer managed by the original operator and the transition has been formally announced here.
- Removing this Node Operator record prevents the ny1 data center from exceeding the cap of 14 rewardable nodes.
- It ensures clean handover and alignment with the previously approved Node Provider onboarding process.
Finalizing removal ensures integrity and accuracy in the NNS registry, supports the decentralization roadmap, and avoids potential reward configuration conflicts.