Subnet Management - e66qm (Application)

Voted to adopt proposal 134544.

This proposal replaces 2 nodes, due to offboarding TY2 and AN1 data centres. Decentralisation parameters are unchanged and remain within the requirements of the target topology. Data centre details are consistent with the links provided in the proposal.

Proposal 134544

Vote: ADOPT

Replaces cordoned nodes 6xfo2 and lt3wc with nodes pfmqh and ftgel on subnet e66qm.
The reason for this proposal is to offboard TY2 and AN1 DCs consistent with forum posts made on the forum thread used for posts regarding the renovation/sell of Gen-1 node machines by NPs.
Both the NP and DC stated in the forum post match the ones from the node being removed in the proposal.